ASHRAE Handbook 2016: HVAC Systems and Equipment (IP) by ASHRAE

By ASHRAE

Show description

Read Online or Download ASHRAE Handbook 2016: HVAC Systems and Equipment (IP) PDF

Best ventilation & air conditioning books

Laboratory Design Guide

Laboratory layout consultant third version is an entire advisor to the complicated technique of laboratory layout and development. With useful suggestion and detailedexamples, it really is an quintessential reference for someone all for development or renovating laboratories. during this operating handbook Brian Griffin explains how one can meet the original blend of necessities that laboratory layout involves.

Residential Energy Auditing and Improvement

This publication is for power auditors or retrofitters, whether or not they paintings within the weatherization application or within the inner most area, and is meant to aid them arrange for a number of certifications. those contain courses with BPI, RESNET-HERS, DOE/NREL, and AEE (Association of strength Engineers). the cloth during this booklet comprises tactics and methods and is meant to be an instructional source.

Construction 2: Environment Science Materials Technology

This publication stories the recommendations of development expertise and companies, and the foundations of environmental and fabrics technology and their functions. It additionally stories the character and the old improvement of the outfitted setting including the jobs of individuals operating within the development undefined.

Plastic Methods for Steel and Concrete Structures

This can be a thoroughly revised, up-to-date and reset variation of the textual content that seemed with an identical name throughout the Nineteen Eighties. It covers the necessities of the latest layout criteria (BS5950, BS8110 and the Eurocodes) and may attract undergraduate and postgraduate scholars of civil and structural engineering and to working towards engineers.

Extra resources for ASHRAE Handbook 2016: HVAC Systems and Equipment (IP)

Sample text

2004. Making them work: Primary-secondary chilled water systems. ASHRAE Journal 46(7). T. 2011. Optimizing design and control of chilled water plants: Part 1: Chilled water distribution system selection. ASHRAE Journal 53(7). T. 2011. Optimizing design and control of chilled water plants: Part 2: Condenser water system design. ASHRAE Journal 53(9). T. 2011. Optimizing design and control of chilled water plants: Part 3: Pipe sizing and optimizing Delta T. ASHRAE Journal 53(12). T. 2012. Optimizing design and control of chilled water plants: Part 4: Chiller and cooling tower selection.

Locating major equipment in roof penthouses may pose significant access problems for repair and replacement. For single high-rise central plants, intermediate-floor locations that are closer to the load may allow pumping equipment to operate at a lower pressure. A life-cycle cost analysis (LCCA) should include differences in plant location to identify the most attractive plant sustainability options during the planning stage. The LCCA should consider equipment maintenance access, repair, and replacement during the life of the plant, as determined in the owner’s criteria.

The same criteria described for cooling are usually used to determine whether a central heating plant or a local one is desirable. Usually, a central, fuel-fired plant is more desirable for heating large facilities. In facilities with low heating loads, electric heating is a viable option and is often economical, particularly where care has been taken to design energy-efficient systems and buildings. Air-Handling Equipment Packaged air-handling equipment is commercially available in many sizes, capacities, and configurations using any desired method of cooling, heating, humidification, filtration, etc.

Download PDF sample

Rated 4.57 of 5 – based on 33 votes